Photo Gallery 2024/25 1st Semester

A crane lowers an air conditioner onto the roof of Blenman Elementary
Trucks carrying air conditioners line the street outside Blenman
HVAC workers in safety gear lower an air conditioner into its place on the roof
An HVAC worker helps raise an air conditioner into the crane
A crane lowers an air conditioner onto Blenman's roof
HVAC workers stand on the roof lowering an air conditioner into place
A crane lowers an air conditioner onto the roof of Bonillas
An HVAC worker in safety gear positions an air conditioner on the roof
A crane lifts an air conditioner from a work truck
An air conditioner is suspended in the air above the solar panel shades
A crane lowers an air conditioner onto the roof of Cavett
The top of the new marquee for Cavett Elementary School sits on the ground waiting to be installed
Construction barricades outside Cavett Elementary
A construction worker stands in a cherry picker being used to install the new marquee
A crane lowers an air conditioner onto the roof of Cavett Elementary
An aerial view of Davis
A closeup of the air conditioning units on top of Davis
A drone shot showing the roof of Davis
The front of Davis Elementary
A closeup of the air conditioning units on top of Davis
The new Lynn-Urquides Elementary School marquee
A faraway view of the new marquee
A blue brick wall with a mural of two coyotes howling at the moon reading Lynn Urquides Elementary School Coyotes 908-4000
A fence outside Lynn Urquides with a banner reading Progress as Promised Your Bond Dollars at Work, Thank you taxpayers!
Front view of new marquee
Closeup side view of new Robison Elementary School marquee
New marquee surrounded by construction equipment and crews standing by truck
The old Robison marquee
The new marquee with a yellow umbrella and other construction tools around it
Front view of the new marquee
* The projected costs provided here are estimates based on information available as of June 2023. Final estimates are determined when each project is designed for the specific site and the district enters into a contract. Actual costs are determined at the completion of work.